We have implemented the PN-EN ISO 9001:2015 management system in the design, production and service of specialized municipal bodies for trucks.
We offer professional renovations of bodies of all manufacturers: garbage trucks, hook lifts, skip loaders, tippers, KP containers, as well as adaptations and renovations of chassis used for municipal bodies.
Please contact us at +48 721 020 600
Our scope of work includes:
Mechanical repairs
Replacing the bottom of garbage truck bodies
Replacing the bottom of the hoppers
Repairs of hydraulic cylinders
Production of hydraulic hoses and pipes for systems in garbage trucks and hooklifts
Sandblasting, priming and painting of municipal vehicles
Adaptations of used chassis for municipal bodies
Transferring bodies between chassis
Installation of pumps and power hydraulics in municipal vehicles
Manufacturing and assembly of mounting plates for special vehicles
Reconstruction of garbage truck press systems
Installation of new garbage lifters
12-month warranty for repairs!
Our plant is leaving another major renovation of the garbage truck body of our 🇵🇱 domestic client. The client picked up the second vehicle from renovation and left us the third one!(November 2024)
Scope of work carried out:
Dismantling of the lifting mechanism together with the external and internal portals
Regeneration of rotary joints
Shot blasting of the lifting mechanism to verify cracks
Welding of cracked external portal covers
Making a new lower cover of the inlet device
Partial replacement of the internal portal sheet metal
Painting of elements in the current color of the structure
Dismantling of the pressing system
Shot blasting of the pressing system to verify damage
Replacement of the press drawer rotation axis pipe
Replacement of the damaged internal surface of the press drawer
Repair of damage to the scraper bucket
Replacement of sliding sleeves and press connection pins
Replacement of the press rotary rollers
Shot blasting of the press actuators
Painting of the complete press system
Breaking off two damaged covers on the bottom of the tail and making a new cover
Verification of the hydraulic system for leaks
Connecting a new TEMA electrical connector
Replacing the step grids for operators
Replacing the dust curtains
Delivery time: 30 days
This is what we like the most! The customer collects one vehicle from us and leaves next one. This time we performed the instalation of a new lifting device (November 2024)
Scope of work carried out:
Installation of a new lifting device
Installation of a container opener with semicircular flaps
Installation of new steps with sensors limiting forward and backward drive
Installation of new road lights
Repainting of a partial tailgate
Adding a new control panels for the lifting device
Delivery time: 20 days
For our domestic client, we performed a completely new electrical installation in his garbage truck body (October 2024)
Scope of work carried out:
Installation of a new control unit,
Making a complete new electrical harness,
Making new control panels,
Installation of a touch screen in the driver’s cabin with self-diagnosis system,
Installation of a new reversing camera with a monitor.
Delivery time: 30 days
This time we want to show you the largest renovation of garbage truck body in the history of the Polish municipal industry that we had the honor to perform! You could see it in the video presentation and today we will tell you a little more about it (September 2024)
Scope of work carried out:
Dismantling the body,
Cleaning, preserving and painting the chassis frame,
Polishing the cabin,
Painting the rims,
Installing new wheel arches and anti-bicycle protections,
Filling of the missing bodywork of the cabin,
Removing the old electrical, hydraulic, pneumatic and lighting installations from the body,
Cutting out the old steel structure in the container and tailgate,
Sandblasting the skeletal frame of the container and tailgate,
Welding in new steel structureof of the container and tailgate,
Making a new paint coat of the container and tailgate,
Dismantling and regeneration of the lifting device,
Dismantling and regeneration of the push-out wall,
Dismantling and regeneration of the pressing mechanism,
Making a completely new hydraulic installation,
Completely new electrical installation,
Completely new pneumatic installation,
Completely new lighting installation,
Complete new operator steps with sensors,
Complete sidewalk lighting,
Complete new control panels.
Delivery time: 120 days
Another week and another completed renovation of the garbage truck body for our 🇵🇱 domestic client (September 2024)
Scope of work carried out:
Rebuilding of the lifting mechanism.
Converting the double lifting mechanizm to a combined monoblock.
Repair of sliding guides.
Replacement of the push-out wall slides.
Removing leaks at the hydraulic distributor.
Container floor overlay – S355 – 5 mm.
Renovation of the pressing system.
Replacement of the upper part of the hopper above the pressing system.
Repair of the sliding chute of the pressing system.
Replaced internal portal cladding.
Replacing the steps with new ones.
Delivery time: 40 days
Another vehicle has left our plant with an adaptation service – installation of a new BFE MW lifting device. Adaptation for our 🇵🇱 domestic customer (August 2024)
Scope of work carried out:
Installation of a new lifting device
Installation of a container opener for semicircular lids
Installation of new steps with sensors limiting forward and backward drive
Installation of new LED work lights
Partial repainting of the tailgate
Adding a control to the lifting device
Delivery time: 30 days
Our plant has undergone another successful renovation, the main aspect of which was the significant reconstruction of the Zoeller 2301 -Delta lifting device (MAY 2024)
Scope of work carried out:
Disassembly of the lifters portals,
Disassembly of both lifters and dismantling them for shot blasting,
Renovation of lifters elements,
Repair of coin machine electronics,
Disassembly of the entire pressing system for shot blasting,
Reconstruction of the press system,
Press cover of 5 mm – S355 steel,
Replacement of press slides and their adjustment,
Completing the missing steell parts of the container and tailgate,
Tailgate painting,
Polishing the container,
Painting of rims,
Improvements of the electronics on the structure.
Delivery time: 40 days
Installation of a new BFE lifting device on a used refuse body for our 🇵🇱 domestic client (January 2024)
Scope of work carried out:
Installation of a new BFE lifting device
Installation of footboards with occupancy sensors
Installation of a handle for opening the semi-circular lid 1100 l
Implementation of additional hydraulic installation
Implementation of additional electrical installation with lifter control
Delivery time: 30 days
Major renovation of the refuse body along with preparation of a used vehicle for the transfer of the body for our 🇵🇱 domestic client (September 2019)
Scope of work carried out:
Removal of the old refuse body from the vehicle
Shortening the vehicle’s wheelbase
Cleaning, priming and painting the chassis frame
Painting of the cabin
Installation of new wheel arches
Installation of the PTO
Repair of the container (replacement of rear panels) + painting of the repaired panels
Repair of the tailgate (side casings, handles, corroded elements)
Replacing the floor in the container
Replacing the floor in the tailgate
Regeneration of the press system (rotation axis, slides and bearings)
Replacement of sets of pusher wall slides
Cylinder regeneration of the press system
Regeneration of the telescopic cylinder
Repair of damaged hydraulic hoses and pipes
Painting the container (inside and outside)
Installation of a new lifter
Renovation of the electrical installation
Installation of the refuse body on the chassis
Delivery time: 60 days
Installation of a BFE lifter on two-chamber refuse body for our 🇵🇱 domestic client (August 2019)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic installation
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Adding a new control for the lifter
Delivery time: 30 days
Installation of a new BFE lifter for our 🇵🇱 domestic client (February 2019)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic installation
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Adding a new control for the lifter
Delivery time: 30 days
Refreshing the refuse body for our 🇵🇱 domestic client (December 2018)
Scope of work carried out:
Steel repair of the container
Painting of the container
Cleaning, priming and painting of the lifter
Cleaning, priming and painting of the container
Partial painting of the outside of the vehicle frame, bumper, vehicle steps and rims
Repair of loose connections on the flexible connections of the lifter
Replacing rubber bumpers
Delivery time: 30 days
Major renovation of the tailgate for our 🇵🇱 domestic client (October 2018)
Scope of work carried out:
Dismantling the press system
Repair of axles, ears and slides of the bucket-drawer system (press system)
Construction of a new sliding plates
Straightening the lower edge of the tailgate and installing a new gasket
Metal repair of the rear wheel arches
Disassembly, regeneration, assembly and painting of the lifter
Straightening walls and side pins
Strengthening the sides of the tailgate
Painting the tailgate
Shortening the cylinders of the lifter
Delivery time: 21 days
Major renovation of a refuse body for our 🇵🇱 domestic client (July 2018)
Scope of work carried out:
Metal repair of the container
Replacing the set of pusher wall slides
Comprehensive reconstruction of the spoon-drawer pressing system with side slides
Replacing the bottom of the container
Replacing the bottom in the tailgate
Renovation of the cylinders – 8 pieces
Replacing cylinder piston rods – 8 pieces
Replacing the piston rods of the tailgate cylinders – 2 pieces
Complete regeneration of the lifter
Cleaning, loading, painting of the container
Cleaning, charging, painting of the tailgate
Regeneration of the hydraulic distributor
Verification, repair, replacement of rubber hoses and hydraulic locks
Inspection of the vehicle’s electrical installation
Installation of new underun protection
Replacing hydraulic filters
Hydraulic oil change
Installing a new tarpaulin on the tailgate
Reconstruction, replacement of mountings and side slides of the press system
Construction of a new ball valve – trigger on the tailgate
Painting rims
Delivery time: 90 days
Installation of a new BFE lifter for our 🇵🇱 domestic client (July 2018)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic system
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Repair of cracks in the side panels of the bodywork + painting
Sandblasting and painting side tilt covers
Drawer tube cover
Painting corrections
Delivery time: 30 days
Major renovation of the refuse body for our 🇵🇱 domestic client (May 2018)
Scope of work carried out:
Container metal repair
Replacing the set of pusher wall slides
Replacing the push wall blade
Push wall crack repair
Comprehensive reconstruction of the press system with side slides
Replacing the bottom of the container
Renovation of piston cylinders
Replacing the bottom in the tailgate
Complete regeneration of the lifter
Regeneration of a garbage truck’s roll bar
Installation + connection of 4 work lights
Regeneration of the hydraulic distributor
Verification of rubber hoses and hydraulic locks
Moving the camera to the center of the tailgate
Cleaning, priming and painting of the container
Installation of new wheel arches
Installation of rubber bumpers on the lifter
Painting rims
Delivery time: 60 days
Major renovation of the lifter for our 🇵🇱 domestic client (May 2018)
Scope of work carried out:
Disassembly of the lifter
Correct and re-welding of the lifter
Making new steel elements
Seal for lifting cylinders
Cleaning, priming and painting the lifter
Delivery time: 10 days
Major renovation of a hooklift device for our 🇵🇱 domestic client (April 2018)
Scope of work carried out:
Removing the hooklift device from the vehicle
Disassembly of the hooklift into the components
Sandblasting, primer painting, surface painting
Seal of the main cylinders
Tower cylinder seal
Regeneration of the main roller seats
Assembly of the hooklift device after renovation
Mounting the hooklift device to the vehicle
Installation of the rear underrun beam
Installation of underrun proctecion
Hydraulic oil replacement, main distributor regeneration
Painting the outside of the main chassis frame
Painting rims
Delivery time: 35 days
Major renovation of a tipper for our 🇵🇱 domestic client (April 2018)
Scope of work carried out:
Dismantling the tipper and removing the tipping cylinder
Cutting off and moving the front wall
Construction of two new side walls (asymmetrical)
Extension of the existing side walls
Construction of new overlays on the upper side walls
Construction of two platforms (front and rear) + ladder
Installing the missing underrun protection
Replacing the wheel arches with new ones
Painting the cabin
Cleaning and painting the vehicle frame
Painting the tipping body
Adding new green rolled tarpaulin
Installation of a new oil tank + accessories
Inspection of the electrical and hydraulic installations, replacement of missing marker lamps
Delivery time: 45 days
Installation of a new lifter for our 🇵🇱 domestic client (March 2018)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic system
Adding electrical installation
Design of a bumper/bar for containers with round lid