DOWNLOAD GOT QUESTIONS!? CALL +48 721 020 600
reliablesimplicity

BALTICUM FRINAB ECOLOGY

REPAIRS

We have implemented the PN-EN ISO 9001:2015 management system in the design, production and service of specialized municipal bodies for trucks.

We offer professional renovations of bodies of all manufacturers: garbage trucks, hook lifts, skip loaders, tippers, KP containers, as well as adaptations and renovations of chassis used for municipal bodies.

Please contact us at +48 721 020 600

Our scope of work includes:

  • Mechanical repairs
  • Replacing the bottom of garbage truck bodies
  • Replacing the bottom of the hoppers
  • Repairs of hydraulic cylinders
  • Production of hydraulic hoses and pipes for systems in garbage trucks and hooklifts
  • Sandblasting, priming and painting of municipal vehicles
  • Adaptations of used chassis for municipal bodies
  • Transferring bodies between chassis
  • Installation of pumps and power hydraulics in municipal vehicles
  • Manufacturing and assembly of mounting plates for special vehicles
  • Reconstruction of garbage truck press systems
  • Installation of new garbage lifters
  • 12-month warranty for repairs!

Our plant is leaving another major renovation of the garbage truck body of our 🇵🇱 domestic client. The client picked up the second vehicle from renovation and left us the third one!(November 2024)

Scope of work carried out:

  • Dismantling of the lifting mechanism together with the external and internal portals
  • Regeneration of rotary joints
  • Shot blasting of the lifting mechanism to verify cracks
  • Welding of cracked external portal covers
  • Making a new lower cover of the inlet device
  • Partial replacement of the internal portal sheet metal
  • Painting of elements in the current color of the structure
  • Dismantling of the pressing system
  • Shot blasting of the pressing system to verify damage
  • Replacement of the press drawer rotation axis pipe
  • Replacement of the damaged internal surface of the press drawer
  • Repair of damage to the scraper bucket
  • Replacement of sliding sleeves and press connection pins
  • Replacement of the press rotary rollers
  • Shot blasting of the press actuators
  • Painting of the complete press system
  • Breaking off two damaged covers on the bottom of the tail and making a new cover
  • Verification of the hydraulic system for leaks
  • Connecting a new TEMA electrical connector
  • Replacing the step grids for operators
  • Replacing the dust curtains

This is what we like the most! The customer collects one vehicle from us and leaves next one. This time we performed the instalation of a new lifting device (November 2024)

Scope of work carried out:

  • Installation of a new lifting device
  • Installation of a container opener with semicircular flaps
  • Installation of new steps with sensors limiting forward and backward drive
  • Installation of new road lights
  • Repainting of a partial tailgate
  • Adding a new control panels for the lifting device

For our domestic client, we performed a completely new electrical installation in his garbage truck body (October 2024)

Scope of work carried out:

  • Installation of a new control unit,
  • Making a complete new electrical harness,
  • Making new control panels,
  • Installation of a touch screen in the driver’s cabin with self-diagnosis system,
  • Installation of a new reversing camera with a monitor.

This time we want to show you the largest renovation of garbage truck body in the history of the Polish municipal industry that we had the honor to perform! You could see it in the video presentation and today we will tell you a little more about it (September 2024)

Scope of work carried out:

  • Dismantling the body,
  • Cleaning, preserving and painting the chassis frame,
  • Polishing the cabin,
  • Painting the rims,
  • Installing new wheel arches and anti-bicycle protections,
  • Filling of the missing bodywork of the cabin,
  • Removing the old electrical, hydraulic, pneumatic and lighting installations from the body,
  • Cutting out the old steel structure in the container and tailgate,
  • Sandblasting the skeletal frame of the container and tailgate,
  • Welding in new steel structureof of the container and tailgate,
  • Making a new paint coat of the container and tailgate,
  • Dismantling and regeneration of the lifting device,
  • Dismantling and regeneration of the push-out wall,
  • Dismantling and regeneration of the pressing mechanism,
  • Making a completely new hydraulic installation,
  • Completely new electrical installation,
  • Completely new pneumatic installation,
  • Completely new lighting installation,
  • Complete new operator steps with sensors,
  • Complete sidewalk lighting,
  • Complete new control panels.

Another week and another completed renovation of the garbage truck body for our 🇵🇱 domestic client (September 2024)

Scope of work carried out:

  • Rebuilding of the lifting mechanism.
  • Converting the double lifting mechanizm to a combined monoblock.
  • Repair of sliding guides.
  • Replacement of the push-out wall slides.
  • Removing leaks at the hydraulic distributor.
  • Container floor overlay – S355 – 5 mm.
  • Renovation of the pressing system.
  • Replacement of the upper part of the hopper above the pressing system.
  • Repair of the sliding chute of the pressing system.
  • Replaced internal portal cladding.
  • Replacing the steps with new ones.

Another vehicle has left our plant with an adaptation service – installation of a new BFE MW lifting device. Adaptation for our 🇵🇱 domestic customer (August 2024)

Scope of work carried out:

  • Installation of a new lifting device
  • Installation of a container opener for semicircular lids
  • Installation of new steps with sensors limiting forward and backward drive
  • Installation of new LED work lights
  • Partial repainting of the tailgate
  • Adding a control to the lifting device

Our plant has undergone another successful renovation, the main aspect of which was the significant reconstruction of the Zoeller 2301 -Delta lifting device (MAY 2024)

Scope of work carried out:

  • Disassembly of the lifters portals,
  • Disassembly of both lifters and dismantling them for shot blasting,
  • Renovation of lifters elements,
  • Repair of coin machine electronics,
  • Disassembly of the entire pressing system for shot blasting,
  • Reconstruction of the press system,
  • Press cover of 5 mm – S355 steel,
  • Replacement of press slides and their adjustment,
  • Completing the missing steell parts of the container and tailgate,
  • Tailgate painting,
  • Polishing the container,
  • Painting of rims,
  • Improvements of the electronics on the structure.

Installation of a new BFE lifting device on a used refuse body for our 🇵🇱 domestic client (January 2024)

Scope of work carried out:

  • Installation of a new BFE lifting device
  • Installation of footboards with occupancy sensors
  • Installation of a handle for opening the semi-circular lid 1100 l
  • Implementation of additional hydraulic installation
  • Implementation of additional electrical installation with lifter control

Major renovation of the refuse body along with preparation of a used vehicle for the transfer of the body for our 🇵🇱 domestic client (September 2019)

Scope of work carried out:

  • Removal of the old refuse body from the vehicle
  • Shortening the vehicle’s wheelbase
  • Cleaning, priming and painting the chassis frame
  • Painting of the cabin
  • Installation of new wheel arches
  • Installation of the PTO
  • Repair of the container (replacement of rear panels) + painting of the repaired panels
  • Repair of the tailgate (side casings, handles, corroded elements)
  • Replacing the floor in the container
  • Replacing the floor in the tailgate
  • Regeneration of the press system (rotation axis, slides and bearings)
  • Replacement of sets of pusher wall slides
  • Cylinder regeneration of the press system
  • Regeneration of the telescopic cylinder
  • Repair of damaged hydraulic hoses and pipes
  • Painting the container (inside and outside)
  • Installation of a new lifter
  • Renovation of the electrical installation
  • Installation of the refuse body on the chassis

Installation of a BFE lifter on two-chamber refuse body for our 🇵🇱 domestic client (August 2019)

Scope of work carried out:

  • New BFE lifter installation
  • Adding a hydraulic installation
  • Adding electrical installation
  • Design of a bumper/bar for containers with a round lid
  • Making a flap for the charging hopper
  • Relocation of rear lamps
  • Adding a new control for the lifter

Installation of a new BFE lifter for our 🇵🇱 domestic client (February 2019)

Scope of work carried out:

  • New BFE lifter installation
  • Adding a hydraulic installation
  • Adding electrical installation
  • Design of a bumper/bar for containers with a round lid
  • Making a flap for the charging hopper
  • Relocation of rear lamps
  • Adding a new control for the lifter

Refreshing the refuse body for our 🇵🇱 domestic client (December 2018)

Scope of work carried out:

  • Steel repair of the container
  • Painting of the container
  • Cleaning, priming and painting of the lifter
  • Cleaning, priming and painting of the container
  • Partial painting of the outside of the vehicle frame, bumper, vehicle steps and rims
  • Repair of loose connections on the flexible connections of the lifter
  • Replacing rubber bumpers

Major renovation of the tailgate for our 🇵🇱 domestic client (October 2018)

Scope of work carried out:

  • Dismantling the press system
  • Repair of axles, ears and slides of the bucket-drawer system (press system)
  • Construction of a new sliding plates
  • Straightening the lower edge of the tailgate and installing a new gasket
  • Metal repair of the rear wheel arches
  • Disassembly, regeneration, assembly and painting of the lifter
  • Straightening walls and side pins
  • Strengthening the sides of the tailgate
  • Painting the tailgate
  • Shortening the cylinders of the lifter

Major renovation of a refuse body for our 🇵🇱 domestic client (July 2018)

Scope of work carried out:

  • Metal repair of the container
  • Replacing the set of pusher wall slides
  • Comprehensive reconstruction of the spoon-drawer pressing system with side slides
  • Replacing the bottom of the container
  • Replacing the bottom in the tailgate
  • Renovation of the cylinders – 8 pieces
  • Replacing cylinder piston rods – 8 pieces
  • Replacing the piston rods of the tailgate cylinders – 2 pieces
  • Complete regeneration of the lifter
  • Cleaning, loading, painting of the container
  • Cleaning, charging, painting of the tailgate
  • Regeneration of the hydraulic distributor
  • Verification, repair, replacement of rubber hoses and hydraulic locks
  • Inspection of the vehicle’s electrical installation
  • Installation of new underun protection
  • Replacing hydraulic filters
  • Hydraulic oil change
  • Installing a new tarpaulin on the tailgate
  • Reconstruction, replacement of mountings and side slides of the press system
  • Construction of a new ball valve – trigger on the tailgate
  • Painting rims

Installation of a new BFE lifter for our 🇵🇱 domestic client (July 2018)

Scope of work carried out:

  • New BFE lifter installation
  • Adding a hydraulic system
  • Adding electrical installation
  • Design of a bumper/bar for containers with a round lid
  • Making a flap for the charging hopper
  • Relocation of rear lamps
  • Repair of cracks in the side panels of the bodywork + painting
  • Sandblasting and painting side tilt covers
  • Drawer tube cover
  • Painting corrections

Major renovation of the refuse body for our 🇵🇱 domestic client (May 2018)

Scope of work carried out:

  • Container metal repair
  • Replacing the set of pusher wall slides
  • Replacing the push wall blade
  • Push wall crack repair
  • Comprehensive reconstruction of the press system with side slides
  • Replacing the bottom of the container
  • Renovation of piston cylinders
  • Replacing the bottom in the tailgate
  • Complete regeneration of the lifter
  • Regeneration of a garbage truck’s roll bar
  • Installation + connection of 4 work lights
  • Regeneration of the hydraulic distributor
  • Verification of rubber hoses and hydraulic locks
  • Moving the camera to the center of the tailgate
  • Cleaning, priming and painting of the container
  • Installation of new wheel arches
  • Installation of rubber bumpers on the lifter
  • Painting rims

Major renovation of the lifter for our 🇵🇱 domestic client (May 2018)

Scope of work carried out:

  • Disassembly of the lifter
  • Correct and re-welding of the lifter
  • Making new steel elements
  • Seal for lifting cylinders
  • Cleaning, priming and painting the lifter

Major renovation of a hooklift device for our 🇵🇱 domestic client (April 2018)

Scope of work carried out:

  • Removing the hooklift device from the vehicle
  • Disassembly of the hooklift into the components
  • Sandblasting, primer painting, surface painting
  • Seal of the main cylinders
  • Tower cylinder seal
  • Regeneration of the main roller seats
  • Assembly of the hooklift device after renovation
  • Mounting the hooklift device to the vehicle
  • Installation of the rear underrun beam
  • Installation of underrun proctecion
  • Hydraulic oil replacement, main distributor regeneration
  • Painting the outside of the main chassis frame
  • Painting rims

Major renovation of a tipper for our 🇵🇱 domestic client (April 2018)

Scope of work carried out:

  • Dismantling the tipper and removing the tipping cylinder
  • Cutting off and moving the front wall
  • Construction of two new side walls (asymmetrical)
  • Extension of the existing side walls
  • Construction of new overlays on the upper side walls
  • Construction of two platforms (front and rear) + ladder
  • Installing the missing underrun protection
  • Replacing the wheel arches with new ones
  • Painting the cabin
  • Cleaning and painting the vehicle frame
  • Painting the tipping body
  • Adding new green rolled tarpaulin
  • Installation of a new oil tank + accessories
  • Inspection of the electrical and hydraulic installations, replacement of missing marker lamps

Installation of a new lifter for our 🇵🇱 domestic client (March 2018)

Scope of work carried out:

  • New BFE lifter installation
  • Adding a hydraulic system
  • Adding electrical installation
  • Design of a bumper/bar for containers with round lid
  • Making a flap for the tailgate
  • Cleaning, priming and varnishing of the tailgate
  • Relocation of rear lamps