We have implemented the PN-EN ISO 9001:2015 management system in the design, production and service of specialized municipal bodies for trucks.
We offer professional renovations of bodies of all manufacturers: garbage trucks, hook lifts, skip loaders, tippers, KP containers, as well as adaptations and renovations of chassis used for municipal bodies.
Please contact us at +48 721 020 600
Our scope of work includes:
Mechanical repairs
Replacing the bottom of garbage truck bodies
Replacing the bottom of the hoppers
Repairs of hydraulic cylinders
Production of hydraulic hoses and pipes for systems in garbage trucks and hooklifts
Sandblasting, priming and painting of municipal vehicles
Adaptations of used chassis for municipal bodies
Transferring bodies between chassis
Installation of pumps and power hydraulics in municipal vehicles
Manufacturing and assembly of mounting plates for special vehicles
Reconstruction of garbage truck press systems
Installation of new garbage lifters
12-month warranty for repairs!
Installation of a new BFE lifting device on a used refuse body for our 🇵🇱 domestic client (January 2024)
Scope of work carried out:
Installation of a new BFE lifting device
Installation of footboards with occupancy sensors
Installation of a handle for opening the semi-circular lid 1100 l
Implementation of additional hydraulic installation
Implementation of additional electrical installation with lifter control
Delivery time: 30 days
Major renovation of the refuse body along with preparation of a used vehicle for the transfer of the body for our 🇵🇱 domestic client (September 2019)
Scope of work carried out:
Removal of the old refuse body from the vehicle
Shortening the vehicle’s wheelbase
Cleaning, priming and painting the chassis frame
Painting of the cabin
Installation of new wheel arches
Installation of the PTO
Repair of the container (replacement of rear panels) + painting of the repaired panels
Repair of the tailgate (side casings, handles, corroded elements)
Replacing the floor in the container
Replacing the floor in the tailgate
Regeneration of the press system (rotation axis, slides and bearings)
Replacement of sets of pusher wall slides
Cylinder regeneration of the press system
Regeneration of the telescopic cylinder
Repair of damaged hydraulic hoses and pipes
Painting the container (inside and outside)
Installation of a new lifter
Renovation of the electrical installation
Installation of the refuse body on the chassis
Delivery time: 60 days
Installation of a BFE lifter on two-chamber refuse body for our 🇵🇱 domestic client (August 2019)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic installation
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Adding a new control for the lifter
Delivery time: 30 days
Installation of a new BFE lifter for our 🇵🇱 domestic client (February 2019)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic installation
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Adding a new control for the lifter
Delivery time: 30 days
Refreshing the refuse body for our 🇵🇱 domestic client (December 2018)
Scope of work carried out:
Steel repair of the container
Painting of the container
Cleaning, priming and painting of the lifter
Cleaning, priming and painting of the container
Partial painting of the outside of the vehicle frame, bumper, vehicle steps and rims
Repair of loose connections on the flexible connections of the lifter
Replacing rubber bumpers
Delivery time: 30 days
Major renovation of the tailgate for our 🇵🇱 domestic client (October 2018)
Scope of work carried out:
Dismantling the press system
Repair of axles, ears and slides of the bucket-drawer system (press system)
Construction of a new sliding plates
Straightening the lower edge of the tailgate and installing a new gasket
Metal repair of the rear wheel arches
Disassembly, regeneration, assembly and painting of the lifter
Straightening walls and side pins
Strengthening the sides of the tailgate
Painting the tailgate
Shortening the cylinders of the lifter
Delivery time: 21 days
Major renovation of a refuse body for our 🇵🇱 domestic client (July 2018)
Scope of work carried out:
Metal repair of the container
Replacing the set of pusher wall slides
Comprehensive reconstruction of the spoon-drawer pressing system with side slides
Replacing the bottom of the container
Replacing the bottom in the tailgate
Renovation of the cylinders – 8 pieces
Replacing cylinder piston rods – 8 pieces
Replacing the piston rods of the tailgate cylinders – 2 pieces
Complete regeneration of the lifter
Cleaning, loading, painting of the container
Cleaning, charging, painting of the tailgate
Regeneration of the hydraulic distributor
Verification, repair, replacement of rubber hoses and hydraulic locks
Inspection of the vehicle’s electrical installation
Installation of new underun protection
Replacing hydraulic filters
Hydraulic oil change
Installing a new tarpaulin on the tailgate
Reconstruction, replacement of mountings and side slides of the press system
Construction of a new ball valve – trigger on the tailgate
Painting rims
Delivery time: 90 days
Installation of a new BFE lifter for our 🇵🇱 domestic client (July 2018)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic system
Adding electrical installation
Design of a bumper/bar for containers with a round lid
Making a flap for the charging hopper
Relocation of rear lamps
Repair of cracks in the side panels of the bodywork + painting
Sandblasting and painting side tilt covers
Drawer tube cover
Painting corrections
Delivery time: 30 days
Major renovation of the refuse body for our 🇵🇱 domestic client (May 2018)
Scope of work carried out:
Container metal repair
Replacing the set of pusher wall slides
Replacing the push wall blade
Push wall crack repair
Comprehensive reconstruction of the press system with side slides
Replacing the bottom of the container
Renovation of piston cylinders
Replacing the bottom in the tailgate
Complete regeneration of the lifter
Regeneration of a garbage truck’s roll bar
Installation + connection of 4 work lights
Regeneration of the hydraulic distributor
Verification of rubber hoses and hydraulic locks
Moving the camera to the center of the tailgate
Cleaning, priming and painting of the container
Installation of new wheel arches
Installation of rubber bumpers on the lifter
Painting rims
Delivery time: 60 days
Major renovation of the lifter for our 🇵🇱 domestic client (May 2018)
Scope of work carried out:
Disassembly of the lifter
Correct and re-welding of the lifter
Making new steel elements
Seal for lifting cylinders
Cleaning, priming and painting the lifter
Delivery time: 10 days
Major renovation of a hooklift device for our 🇵🇱 domestic client (April 2018)
Scope of work carried out:
Removing the hooklift device from the vehicle
Disassembly of the hooklift into the components
Sandblasting, primer painting, surface painting
Seal of the main cylinders
Tower cylinder seal
Regeneration of the main roller seats
Assembly of the hooklift device after renovation
Mounting the hooklift device to the vehicle
Installation of the rear underrun beam
Installation of underrun proctecion
Hydraulic oil replacement, main distributor regeneration
Painting the outside of the main chassis frame
Painting rims
Delivery time: 35 days
Major renovation of a tipper for our 🇵🇱 domestic client (April 2018)
Scope of work carried out:
Dismantling the tipper and removing the tipping cylinder
Cutting off and moving the front wall
Construction of two new side walls (asymmetrical)
Extension of the existing side walls
Construction of new overlays on the upper side walls
Construction of two platforms (front and rear) + ladder
Installing the missing underrun protection
Replacing the wheel arches with new ones
Painting the cabin
Cleaning and painting the vehicle frame
Painting the tipping body
Adding new green rolled tarpaulin
Installation of a new oil tank + accessories
Inspection of the electrical and hydraulic installations, replacement of missing marker lamps
Delivery time: 45 days
Installation of a new lifter for our 🇵🇱 domestic client (March 2018)
Scope of work carried out:
New BFE lifter installation
Adding a hydraulic system
Adding electrical installation
Design of a bumper/bar for containers with round lid
Making a flap for the tailgate
Cleaning, priming and varnishing of the tailgate
Relocation of rear lamps
Delivery time: 30 days
Major renovation of the refuse body for our 🇵🇱 domestic client (February 2018)
Scope of work carried out:
Cleaning, priming and painting of the container
Repair of container plating
Sandblasting and varnishing of tilting side covers
Cleaning, priming and varnishing of the tailgate
Repair of press system
Regeneration of the lifter
Repair of drawer cylinder pins
Repair and making a cover for the inside of the press
A cover made of S355 sheet metal – 4mm thick, covering the entire container floor
Replacing the push wall blade
Replacement of the side wheel arch
Regeneration of the lifter cylinders
Repair of steps
Replacement of wall slides
Polishing rims
Delivery time: 30 days
Major renovation of the tailgate and press system for our 🇵🇱 domestic client (January 2018)
Scope of work carried out:
Cleaning, priming and painting of the tailgate
Replacing sidewall sheets
Repair of side drawer guides
Removing the play in the drawer axle connection
Straightening the drawer after complete disassembly
Sealing of drawer and press cylinders
Repair of drawer and press press pins
Regeneration of the lifter
Regeneration of the lifter cylinders
Regeneration of the gears of the lifter
Reconstruction of the container opening mechanism and the handle
Sealing of the telescopic cylinder of the pushing wall
Delivery time: 40 days
Replacement of the refuse body for our 🇵🇱 domestic client (December 2017)
Scope of work carried out:
Dismantling of old refuse body
Refreshing the chassis frame
Painting the cabin
Installation of the new BFE refuse body
Installation of new wheel arches and underrun protection
Full technical inspection of the chassis
Delivery time: 30 days
Major renovation of a skiploader for our 🇵🇱 domestic client (November 2017)
Scope of work carried out:
Dismantling the skiploader
Sandblasting and painting of the device
Manual cleaning of the chassis frame
Primer and varnish of the frame
Regeneration of distributors
Sealing of the device arm cylinders
Removing any looseness in the device’s arms
Regeneration of foot cylinders
Partial replacement of the main frame of the device
Replacement of all floor panels
Replacement of damaged and old hydraulic lines
Delivery time: 40 days
Renovation of a hooklift device for our 🇵🇱 domestic client (October 2017)
Scope of work carried out:
Dismantling the old hooklift and crane
Complete disassembly of the hooklift
Refreshing the chassis frame
Painting rims
Refreshing the crane
Installation of a new hooklift device
Construction of a new frame for the crane
Crane assembly
Installation of new wheel arches, underrun protections, mud flaps and marker lights
Delivery time: 30 days
Repair of a damaged press system for our 🇵🇱 domestic client (October 2017)
Scope of work carried out:
Repair of the press system
Replacement and repair of the press rotation axis
Repairing a cracked drawer
Welding of the tailgate cracks
Painting of the press system
Delivery time: 8 days
Replacement of the hooklift device our 🇸🇪 Swedish client (September 2017)
Scope of work carried out:
Hook replacement
Replacement of all tower slides
Replacement of all hydraulic pipes
Installing a new PTO
Installation of a new distributor
Checking the pump
Construction and installation of a new oil tank
Replacement of the hooklift control system with a pneumatic one
Removal of play (replacement of bushings, partly pins) in the main cylinders, rear run-on rollers, frame-frame connection
Inspection of the hydraulic and electrical installation of the device